OTEC Engineering, partnering with Tractebel Engineering (France and Côte d’Ivoire), has visited SM Plus (EKDS Nouvelle) in Abidjan for the launch of the Feasibility Studies of Aboisso-Comoé HPP project. The trip also included a site visit to assess the potential dam axes and plant location.
The Aboisso-Comoé project, developed by SM Plus, is located in the east of Abidjan on the Komoé river has a potential of 90 MW installation. OTEC Engineering partnering with Tractebel Engineering will perform the feasibility studies of the project.
