top of page

Wujin South Phase 1 Waste Water Drainage Network and Treatment Plant

Capacity

40 000 m3/day

Location

China

Completion date

2008

Work scope: 

  • A Waste Water Drainage Network, 30km precast concrete 

  • 2 pumping stations 40 000m3/day treatment plant with Carrousel 2000 process 


Services: 

  • Feasibility Report 

  • Basic Design 

  • Technical specifications of equipments 

  • Construction Design 

  • As-built drawings

Related expertises

Related projects

bottom of page