top of page

Wujin South Phase 2 Waste Water Drainage Network and Treatment Plant and Advanced processing plant

Capacity

100 000 tons/day

Location

China

Completion date

2014

Work scope: 

  • 1 Waste Water Drainage Network extension 40km precast concrete pipes with diameter from 300 to 2000mm 

  • 3 pumping stations 1 60 000m3/day treatment plant with Carrousel 2004 process 

  • 1 Advanced deep processing plant 100 000 m3/day 


Services: 

  • Feasibility Report 

  • Basic Design 

  • Technical specifications of equipments 

  • Construction Design 

  • As-built drawings

Related expertises

Related projects

bottom of page