top of page

Hydroelectric Project of Gribo Popoli - 112MW

112 MW

Capacity

Location

Ivory Coast

2018

Completion Date

Work scope:

  • An earth filled dam with a length of approximately 4000 m;

  • A 6 passes gated spillway incorporated in the dam on the left bank

  • A powerhouse integrated into the body of the dam on the right bank, equipped with three Bulb units with a total installed capacity of 112 MW

  • A tailrace channel of approximately 700m in length;

  • A 225kV switchyard;

  • Two single circuit overhead lines of 225kV for the cut-off connection to the 225 kV line Soubré-San Pedro, approximately 2x8km;

  • A permanent access road on the right bank of approximately 15 km, and a deviation from the road on the left bank of 8 km.


Services:

  • Feasibility studies;

  • Definition of the geological and geotechnical investigations, and geological and geotechnical study;

  • Assistance to the meeting between the Contractor and the Employer

  • Review and Advice to the Basic and Construction Design

Related expertises

Related projects

Beijing Address 

28A, Shangdi Information Road, Keshi Plaza, Tower C-07A

Haidian District, Beijing China 100085

Hong Kong Address

Level 54 Hopewell Center,

183 Queen's Road East

Wan Chai, Hong Kong

Paris Address

58 rue de Monceau CS 48756

75008 Paris , France

bottom of page