Hydroelectric Project of Gribo Popoli - 112MW
112 MW
Capacity
Location
Ivory Coast
2018
Completion Date
Work scope:
An earth filled dam with a length of approximately 4000 m;
A 6 passes gated spillway incorporated in the dam on the left bank
A powerhouse integrated into the body of the dam on the right bank, equipped with three Bulb units with a total installed capacity of 112 MW
A tailrace channel of approximately 700m in length;
A 225kV switchyard;
Two single circuit overhead lines of 225kV for the cut-off connection to the 225 kV line Soubré-San Pedro, approximately 2x8km;
A permanent access road on the right bank of approximately 15 km, and a deviation from the road on the left bank of 8 km.
Services:
Feasibility studies;
Definition of the geological and geotechnical investigations, and geological and geotechnical study;
Assistance to the meeting between the Contractor and the Employer
Review and Advice to the Basic and Construction Design