Hydropower Project of Gouina - 140MW

Capacity

140MW

Location

Mali

Completion date

2020

Work scope:

  • A concrete gravity dam with an overflowing spillway over the entire length of 560 m;

  • A headrace channel of 290m long;

  • A powerhouse equipped with 3 Kaplan turbine-generator units with a total capacity of 140MW;

  • A tailrace channel of 90m wide and 395m long;

  • A transmission line of 225kV and about 58 km long;

  • Two 225kV switchyards: 1 to be built, 1 to be extended.


Services:

  • Alternative Studies for the preparation of technical proposal;

  • Technical and commercial support for contract negotiation;

  • Review and advice of Basic and Construction design;