Hydropower Project of Felou - 63MW

Capacity

63 MW

Location

Mali

Completion date

2012

Main scope:

  • A dam with a length of 830m;

  • A headrace channel of 630 m long and 28 m width;

  • A powerhouse equipped with three Bulb-type turbine-generator units with unit power of 21 MW;

  • A 225kV Felou switchyard and extension work at the Kayes 225kV substation;

  • A 225kV transmission line connecting the Felou switchyard to the Kayes substation.


Services:

  • Technical Assistance for Bidding Process;

  • Review and advice of Basic and Construction Design;

  • Technical assistance to the approval process of equipment characteristics, fabrication, factory inspection, site installation & commissioning and O&M manuals;

  • Technical Assistance for Claim