Hydropower Project of Felou - 63MW
Capacity
63 MW
Location
Mali
Completion date
2012
Main scope:
A dam with a length of 830m;
A headrace channel of 630 m long and 28 m width;
A powerhouse equipped with three Bulb-type turbine-generator units with unit power of 21 MW;
A 225kV Felou switchyard and extension work at the Kayes 225kV substation;
A 225kV transmission line connecting the Felou switchyard to the Kayes substation.
Services:
Technical Assistance for Bidding Process;
Review and advice of Basic and Construction Design;
Technical assistance to the approval process of equipment characteristics, fabrication, factory inspection, site installation & commissioning and O&M manuals;
Technical Assistance for Claim