Hydropower Project of Felou - 63MW

63 MW

Capacity

Location

Mali

2012

Completion Date

Main scope:

  • A dam with a length of 830m;

  • A headrace channel of 630 m long and 28 m width;

  • A powerhouse equipped with three Bulb-type turbine-generator units with unit power of 21 MW;

  • A 225kV Felou switchyard and extension work at the Kayes 225kV substation;

  • A 225kV transmission line connecting the Felou switchyard to the Kayes substation.


Services:

  • Technical Assistance for Bidding Process;

  • Review and advice of Basic and Construction Design;

  • Technical assistance to the approval process of equipment characteristics, fabrication, factory inspection, site installation & commissioning and O&M manuals;

  • Technical Assistance for Claim

Related expertises

Related projects

Beijing Address 

28A, Shangdi Information Road, Keshi Plaza, Tower C-07A

Haidian District, Beijing China 100085

Hong Kong Address

Level 54 Hopewell Center,

183 Queen's Road East

Wan Chai, Hong Kong

Paris Address

58 rue de Monceau CS 48756

75008 Paris , France

bottom of page