Kariba North Bank - Kafue West 330kV Transmission Project

Capacity

330 kV

Location

Zambia

Completion date

2014

Work scope:

  • 135km long 330kV transmission line from Kariba North Bank Substation to Kafue West Substation

  • Extension of 330kV line bay in Kariba North and Kafue West Switchyard


Services:

  • Foundation design, steel tower design, electrical design and earthing design;

  • Consultant service work for the 330 kV transmission line including tower erection, conductor stringing work, equipment erection, testing, commissioning work and all other related works

  • Basic Design and Construction Design of the extension 330kV existing switchyard and filed testing and commissioning.