Transmission lines and Substations of Soubre project
Capacity
-
Location
Ivory Coast
Completion date
2017
Work scope:
Three single-circuit transmission lines of 225kV providing the junction between powerhouse and Soubré substation;
Three single-circuit transmission lines of 225kV, connecting Soubré-Taabo-Yopougon 2-Abobo (370 km);
Two double-circuit transmission lines of 225 kV (10km);
A medium voltage distribution line at 33kV from Soubré substation serving the powerhouse and a cable from powerhouse serving the spillway;
Extension works for four 225kV substations Abobo, Yopougon 2, Taabo and Soubré, in total of thirteen 225kV bays.
Services:
Conceptual design for technical proposal
Design (Basic Design and Construction Design) supervision